Gunite Pool Build
Timeline
1
Excavation
The Excavation Crew will Layout the Area, Frame the Pool, and Begin the Process of Digging.
2
Steel
The Steel Crew will follow the Engineered Drawings and Layout the Rebar according to the Design Plan.
3
Plumbing
The Plumbing Crew will run all of the plumbing in the trenches and install the equipment and put the lines under pressure.
4
Gunite or Shotcrete
The Gunite Crew will amaze you with the way the shape and form the pool shell.
5
Tile & Coping
The Tile & Copoing Crew will install the tile and coping that you chose from our showroom.
6
Back Fill, Drains, and Patio Forming
Our crew will start removing the mounds of dirt and will begin backfilling the trenches and grading off for the patio.